2006年本钢炼钢项目新上一台180t钢包精炼时引起无功功率倒送,并且钢包精炼炉冶炼产生的电压波动和谐波电流影响发电厂电动鼓风机的运行,提出改造解决方案,利用原静补装置改造成动态无功功装置,使电网质量达到国家标准的要求。炉(3号LF炉),由于静补装置在3号LF炉生产间歇率补偿(SVC)
In 2006, when a new 180t ladle was refinished, the reactive power was newly refurbished during the last 180t ladle refining process. The voltage fluctuation and harmonic current produced by smelting of the ladle refining furnace affected the operation of the electric blower of the power plant. The solution to the problem was proposed by using the original Static compensation device into a dynamic reactive power device, the power grid quality to meet the requirements of national standards. Furnace (LF furnace No.3), due to the static compensation device in the No. 3 LF furnace production intermittent rate compensation (SVC)