论文部分内容阅读
混凝土泵管包冰控温施工技术从控制泵送混凝土入模温度着手,使混凝土在炎热天气下,通过泵送到达浇筑地点的入模温度不高于甚至低于入泵温度,并结合在搅拌过程中加冷水或加冰等降温措施,使混凝土内部最高温度得到有效控制,从而降低混凝土温度裂缝风险,提高大体积混凝土施工质量。
Concrete pump pipe package ice temperature control technology from the control of pumping concrete into the mold temperature to start, so that the concrete in hot weather, by pumping to pouring location into the mold temperature is not higher than or below the pump temperature, combined with mixing During the process, cooling measures such as cold water or ice are added to effectively control the maximum internal temperature of the concrete so as to reduce the risk of concrete temperature cracks and improve the mass concrete construction quality.