过去几年里 ,Newmont金矿公司开发了一种处理难选含金硫化矿的新工艺 ,即N2 浮选工艺。 1997年 4月 ,第一个应用N2 浮选工艺的工业选矿厂在美国内华达州LoneTree矿山成功投产。该浮选厂设计能力为 40 85t/d矿石 ,或 494t/d硫化矿精矿。一部分浮选精矿与给矿合并给入LoneTree高压氧化厂 ,因而限制了现有高压氧化厂处理能力的提高。剩余的精矿卖给TwinCreeks高压氧化厂或Carlin焙烧厂 ,在这些厂中先氧化再回收金。本文讨论了N2 浮选工艺扩大试验厂试验和工业选矿厂生产结果 ,以及工程设计模拟结果。同时还提出了N2 浮选工艺的基本投资和生产费用数据。
In the past few years, Newmont Gold Company has developed a new process for the treatment of refractory gold-bearing sulphides, the N2 flotation process. In April 1997, the first industrial concentrator using the N2 flotation process was successfully put into operation at the LoneTree mine in Nevada, USA. The flotation plant has a design capacity of 40 85t / d ore or 494t / d sulphide concentrate. A portion of the flotation concentrates are combined with the feedstock into the LoneTree High Pressure Oxidation Plant, thus limiting the increased capacity of existing high pressure oxidation plants. The remaining concentrate is sold to the TwinCreeks autoclave or Carlin roasting plant, where they are oxidized and recovered. This article discusses the N2 flotation process to expand pilot plant test and industrial beneficiation plant production results, as well as engineering design simulation results. Also proposed N2 flotation process of basic investment and production costs data.