某新建6层综合楼与原3层住宅楼山墙之间仅留60毫米沉降缝,设计和施工山墙基础的指导思想是尽量少破损原基础,尽量减少新楼沉降过程对原楼的影响。一、施工做法因新楼±0.000比原楼低0.70米,必须对原楼基础拆除较多大放脚才能施工承台梁,见图1。拆除过程保留了桩孔之间的80%灰土和底层120毫米高大放脚,并用1:2水泥砂浆粉刷补强保护。虽然拆除太多,但对原楼比普通设置沉降缝的砖基础,还扩大了承压面积。二、设计机理
There is only 60 mm of settlement joints between a newly built 6-storey building and the original 3-storey residential building gable. The guiding principle for the design and construction of the gable base is to minimize the damage to the original foundation and minimize the impact of the new building settlement process on the original building. First, construction practices Because the new building ± 0.000 is 0.70 meters lower than the original building, the foot of the original building must be dismantled to build the platform beam. See Figure 1. The dismantling process retains 80% of lime soil between the pile holes and 120mm high footing of the bottom layer and reinforces it with 1:2 cement mortar. Although the removal of too much, but for the original building than the ordinary settlement of the brick foundation, also expanded the pressure area. Second, the design mechanism