今年春天,我们接受了一个新电厂首期工程的安装任务。建设这个发电厂的特点是:机组技术复杂,施工期短,技术力量差,材料、设备供应不足,缺乏大型起吊机和工具,交通运输不便,所有这些,给施工带来了不少困难。但是由于我们在党的正确领导下,认真贯彻了党的总路线,大搞组合安装,大搞简易发电,经过65天的辛勤奋战,终于使新机组发出了强大的电力,对保证当地工农业生产的持续跃进,起了推波助澜的作用。争高速,思想先行快安装,大搞组合在这次安装工程中,能够取得这些成绩,是自始至终认真贯彻“快建、早发、早供、优质、高效、节约、安全”全面跃进的方针的结果。整个安装过程,是不断与右倾保守思想斗争的过程,从安装开始到简易发电,是“稳步不前,慢建迟发”,还是“分秒必争、快建早发”;是“件件落实,然后动手”,还是“基本落实,力争提前”;是“求洋求全,等待发电”,还是“先简后全,简易发电”等一系列斗争的胜利的过程。1月中旬,当我们进久现扬大搞组合安装时,土建正在
This spring, we accepted the installation of the first phase of a new power plant. The characteristics of the construction of this power plant are: complex technology of the unit, short construction period, poor technical force, insufficient supply of materials and equipment, lack of large cranes and tools, and inconvenient transportation, all of which have brought a lot of difficulties to the construction. However, due to the correct leadership of the Party, we have earnestly implemented the party’s general line, and vigorously engaged in combination and installation. We have succeeded in generating electricity with ease. After 65 days of hard work, the new units have finally sent out powerful electricity to ensure local industrial and agricultural production. The continued leap forward has played a role in fueling the crisis. High-speed competition, quick installation of thoughts, and large-scale combination in this installation project can achieve these achievements. It is a policy of conscientiously implementing the principle of “quick-building, early-onset, early-onset, high-quality, high-efficiency, cost-effective, and safe” full-scale leap forward from beginning to end. result. The entire installation process is a constant struggle against the right-leaning conservative ideology. From the beginning of installation to simple power generation, it is “steady, delayed construction delays” or “every minute and second, fast-tracking early-onset”; “Hands-on,” or “basically implemented, and strive to advance”; is “seeking perfection, waiting for power generation”, or “simply complete, simple power generation” and a series of struggles such as the victory of the process. In mid-January, when we advanced into a large-scale assembly installation, the civil works