新疆农村改水防病工程是自治区“九五”期间的重点工程,目前该工程实施已进入第三期。其特点是点多、线长、面广,涉及到全疆所有的地(州)、县(市),大多属于小型工程。就工程投资概算编制而言,如何灵活运用现行的管理办法,结合工程的特点和当时当地的实际情况开展工作,是投资控制的关键。从宏观的角度出发,制定出适合新疆农村改水防病工程投资概算编制的规定,无疑对充分发挥资金效益起着积极的指导作用。
The rural water improvement and disease prevention project in Xinjiang is a key project in the autonomous region during the “Ninth Five-Year Plan” period. At present, the project has entered the third phase of its implementation. It is characterized by multiple points, long lines, and wide areas. It involves all the prefectures (prefectures) and counties (cities) of Xinjiang and mostly belongs to minor projects. Regarding the preparation of the project investment estimate, how to flexibly use the current management methods and combine the characteristics of the project with the local actual situation at the time is the key to investment control. From the macroscopic point of view, formulating regulations for the preparation of investment estimates for rural water and disease prevention and control projects in Xinjiang will undoubtedly play a positive guiding role in giving full play to capital efficiency.