论文部分内容阅读
用传统方法进行新建矿井的井下区段供电设计,是相当繁重的。设计过程中必须选择开关设备的型号,选配电缆的等级和截面,审核选定网路的技术参数是否与工艺检查标
It is rather heavy to design the underground section power supply of the new mine by the traditional method. The design process must choose the type of switchgear, optional cable grade and cross-section, the selected network to review the technical parameters and whether the technical inspection standard