论文部分内容阅读
[美国《核专业》1994年夏季刊报道] 1.坚持把反应堆安全作为一切工作中第一件要做的事情和先决条件; 2.核电机组停机要始终如一保证机组安全、有效和使之有良好运行实绩; 3.要严格规定机组停役时间,对雇员和承包商提出严格的要求,以达到或超过人们所希望的目标; 4.要规划和计划停机的每一个细节;
[US Nuclear Science, 1994 Summer Edition] 1. Insist on the safety of reactors as the first thing to do in all work and preconditions; 2. Nuclear power plant downtime should be consistent to ensure that the unit safe, effective and make it Good operational performance; 3. To strictly regulate the unit decommissioning time, stringent requirements for employees and contractors to meet or exceed the desired goal; 4. To plan and plan for every detail of the shutdown;