根据丁部长指示,这次中国铁路工程管理赴日研修组,研修的主要课题是日本国铁和建设公团的铁路施工管理体制,工程项目全过程包括计划、设计、积算、发包、施工和验交等的管理,还有技术开发管理,标准、规范的修订及实施办法等。赴日研修的期限是1986年9月24日至11月7日,共45天。研修地点是日本东京国除协力事业团八王子修研中心。研修组由4人组成,基建总局技术处副处长刘统畏任组长,组员有外事局孙利石,第一工程局副总工程师杜谟远,第四勘测设计院第一总队副队长谢维珊。现将研修情况报告如下。
According to Minister Ding, the railway construction management team in Japan went to Japan for training. The main topic of the training was the railway construction management system of Japan’s Railways and Construction Corps. The whole process of the project includes planning, design, calculation, contracting, construction and construction Inspection and other management, as well as technology development and management, standards, norms of the revision and implementation measures. The period of study tour in Japan is from September 24, 1986 to November 7, 1986, a total of 45 days. The place of study is Japan’s Hokkai University Hachioji Research Center in addition to collaborating groups. The training group consists of 4 members. Liu Tongwei, deputy director of the Technology Department of the Infrastructure Department, resigned as the head of the group. Sun Li Shi, member of the Foreign Affairs Bureau, Du Moyuan, deputy chief engineer of the First Engineering Bureau, and Xie Weishan, the vice captain of the First Corps of the Fourth Survey and Design Institute were all members of the training team. Now the training situation report as follows.