摘要:随着现代建筑的不断发展与进步以及工程规模的扩大,建筑工程施工企业的的生产方式也在不断更新。在当今市场经济的大潮中,建筑企业的竞争可谓达到了白热化,“多揽活、干好活”是每个企业的共识。建筑工程项目已成为当今社会发展经济的重要部分,加强施工管理显得十分重要。因此本文对工程项目管理提出了几点建议性措施。
关键词:项目;质量;安全;技术;进度
Abstract: With the modern architectural development and progress and expand the size of the project, the construction enterprise production methods are constantly updating. In the spring tide of the market economy, the competition of the construction enterprises has reached a white hot, "Lanhuo, do a good job" is the consensus of each enterprise. The construction project has become an important part of economic and social development, strengthen the construction management is very important. Therefore, this paper put forward some suggestions on the project management measures.
Key words: project; quality; safety; technology; progress
中图分类号:TU723.3
前言:建筑工程项目建设长期以来一直是我国经济发展的载体,科学管理代替以往粗放式盲目式建设势在必行。具体来说,要从思路调整、方案转换、工程施工等方面协力改善,要达到真正的改善目的,要做到统一协调,有效避免是测、失控等问题的出现。
一、把项目评估、合同签订,作为加强工程项目管理的基础
实行项目评估、项目经理负责制是堵塞项目效益流失的第一道关口。当前不少施工企业对项目评估、测算的地位和作用认识不足;有的评估、测算的权限不明确,方法不科学;有的评估、测算滞后,激励约束不到位,缺乏动态跟踪考核,造成项目管理失控。
为解决好这个问题,必须抓好四个方面的工作:一是提高认识。在思想上切实把项目评估、测算作为加强项目管理的基础,堵塞效益流失的第一道关口来认识,自觉地搞好评估和测算。二是加强评估、测算的组织领导,要成立专门的领导小组,有专人负责,有科学的评估、测算指标体系。三是依法签订承包经营合同,上缴风险保证金、委派主办会计。四是认真进行项目运行中的监督、检查、指导和考核。帮助项目经理及时纠正经营管理偏差,确保项目目标实现。
二、把人力资源的优化配置,作为加强工程项目管理的重点
施工企业要根据工程项目对劳动力的需求情况,在各项目之间,对实现和潜在的劳动力进行周密计划,有效流动,合理调配,充分调动人的积极性和创造性,提高劳动效率。项目经理部要按照动态平衡、统筹优化的原则,建立劳动整体优化、实现劳动力供给与项目需求最佳组合的人力资源管理运行机制,对劳动力的分配和流向作出总体安排,保证劳动力与项目需求的总体平衡,并定期跟踪检查,进行有效监控和及时调整,使劳动力资源得到最大限度的利用。
三、推行项目管理责任制
一般建筑工程项目规模比较大、分项工程或单项工程多,施工管理和合同管理难度大。在精干主体的基础上,还必须进一步减化生产关系,减少管理层次,变金字塔式的管理为扁平式管理。实施工程项目管理有多方面的管理要素,不同的工程项目又有不同的管理重点,但项目管理责任制和项目成本核算制始终是项目管理的核心。它的落实与否,决定着项目管理的效果与成败。项目经理在授权范围内处理和协调甲乙方,总包与分包方、监理方、设计方以及当地政府有关部门等各方面的关系,保证工程项目的协调有序实施。企业内部要用完善的市场机制、用人机制、分配机制、服务机制和监督机制等有效机制来保证项目经理责任制的落实。有效灵活的组织体系是实现工程项目的四控制(进度、质量、安全、成本)、四管理(合同管理、现场管理、信息管理、生产要素管理),保证工程项目三大目标实现的必要条件。建设承包公司对项目部严格按照项目管理的原则和合同履约要求进行资源配置,下达生产计划和各项经济技术各核指标,以保证实现预期的项目管理目标。
四、按进度计划组织,确保工程质量创优
工程进度的控制是一个复杂的系统工程,从工程的整体到局部,由控制计划到控制作业,都需要逐一细化,直到对每个作业点的控制,使项目总进度牢固地建立在局部作业进度控制基础之上。因此,必须综合考虑各方面的因素,制定出科学合理的进度计划,使之有利于实际作业。首先,在计划控制的实施过程中,要严格按照进度计划组织。根据项目经营目标、组织设计和现场情况,编制各作业单元具体执行的作业计划,严格按作业计划进行作业,做到不赶进度、不误工期,按工艺作业,确保工程质量达到优质标准。其次,在作业计划的实施过程中,既要保证进度又要保证质量。要掌握现场实际情况,搞好各工序间的衔接和协调工作,做好记录,排除故障,解决好随时出现的问题,使作业计划能顺利进行,在每个环节中把好质量关。
五、做好技术管理
技术管理是项目管理的重中之重,技术管理不到位,工程质量将无法得到保证。因此,选择一名有经验、有责任心、能力强的总工程师尤为重要,再根据项目需要选配合适的工程部长、工程师、技术员、试验员等岗位人员。技术管理工作要做到规范化、标准化、制度化,满足可追溯的原则。项目部领到图纸后,要立即组织有关人员认真进行自审,熟悉图纸,弄清设计意图、工程特点和施工中可能出现的问题,作好记录,参加业主(监理)主持召开的图纸会审,提出问题,弄清情况;对设计变更应及时办理手续,建立好臺帐;工程各子项目开工前,总工程师要组织施工技术人员就施工项目的内容、技术标准、工程特点、设计意图、施工方案与要求、施工顺序、工期、进度安排、工艺质量标准、设备物资供应的安排、安全质量措施等进行技术交底,对施工队的技术交底要分批、分段进行,派专门的技术人员贯彻控制在整个施工过程中;技术资料要及时、完整、真实,指定专人负责收集竣工所需的技术资料并进行整理、编目、分类、装订成册,为工程交工验收提供依据;技术人员要积极学习和推进新技术的应用,聘请专家对工程出现的技术难题进行会诊解决,开展全员参与技术创新的活动,为工程献计献策。
六、加强工程施工质量安全管理
1、建立质量自检制度
工程质量的优劣牵涉到社会的各个方面,也是一个企业管理水平的综合体现。一般来说任何一个工程建设项且都应当接受企业自身的监督。企业自身监督就要求每个建筑施工企业都应当建立起一个行之有效的质检机制和质量体系,通过自检制度的运行达到质量的持续改进。现行的机制主要是项目部质检员及各施工管理人员项目经理进驻工地监督施工质量,项目部质检员巡查项目质量情况,公司质检科组织定期质量验收,做到层层负责的监督对工程质量把关。
2、加强第三方质量监督
第三方监督指业主(监理)的监督,是目前最权威性的监督。由业主委派或委托的质量监督小组,长驻工地,对工程中尚未施工或正在施工的和已完成施工分部、分项工程及各道工序进行全面监督。现场监督对于施工作业中每道工序做到现场检查发现问题,随时指出并纠正,检查手段采取实测实量和整体观感相结合的方式,已形成的成品有权责令施工人员推倒重来。还可以召集现场管理人员,对施工中普遍存在的问题予以指明,严格对施工工人进行工序技術交底,纠正错误,限时改正。
3、制定安全管理措施
根据施工生产特点、工程特质制定详细的项目安全风险预测及相应的保证措施,并对项目风险进行分解,把安全责任落实到各部门、班组及个人,以便在项目实施全过程更好地管理。加强安全教育及培训,做好生产前的安全技术交底,生产中实行定期或不定期的安全检查,制定切实可行的安全生产预案,做好监管。建筑行业较差的安全管理状况导致了生产率降低、成本上升、工程质量水平降低、建设周期加长等,因此,要始终把”安全第一”作为企业基本经营方针,树立“一切事故都是可以预防并避免”的指导思想,全面开展“事故零目标”推进活动。
4、加强与完善企业内部中的生产要素并配置机制建设
建立与完善工程企业的“五大市场”,即:劳务人才市场、材料的供应市场、机构设备与租赁的市场、资金使用管理市场一结算中心以及技术的市场等内部生产要素必须要有效配置管理体制和运行机制,促进企业资源的有序流动与优化组合。在项目施工过程应推广应用新技术、新工艺、新材料、新设备,提高工程建设的科技含量。企业要加大科技投入,提高技术装备水平。总之,施工项目管理是建筑企业的能量和竞争实力的体现,所以我们要下决心搞好施工项目管理,振兴我们企业,这也是我国建筑改革的出发点、立足点和着眼点。
七、总结
建筑工程施工管理是一项全面、深入细致的工作,它贯穿于施工项目全过程,不仅需要企业管理层的重视和支持,还需要广大员工的积极配合,并以各项规章制度的贯彻和有效措施的执行作保障。只有这样,才能在满足工程建设要求的情况下实现企业经济效益,提高企业施工管理水平。
参考文献:
【1】梁世连.惠恩才.工程项目管理学[M].大连:东北财经大学出版社,2001.
【2】郑真爱.建筑工程项目施工管理创新研究[J].消费导刊, 2009(14).
【3】金丽华.浅谈项目管理在制造业成本控制方面的应用[J].经营管理者,2008,(15).
关键词:项目;质量;安全;技术;进度
Abstract: With the modern architectural development and progress and expand the size of the project, the construction enterprise production methods are constantly updating. In the spring tide of the market economy, the competition of the construction enterprises has reached a white hot, "Lanhuo, do a good job" is the consensus of each enterprise. The construction project has become an important part of economic and social development, strengthen the construction management is very important. Therefore, this paper put forward some suggestions on the project management measures.
Key words: project; quality; safety; technology; progress
中图分类号:TU723.3
前言:建筑工程项目建设长期以来一直是我国经济发展的载体,科学管理代替以往粗放式盲目式建设势在必行。具体来说,要从思路调整、方案转换、工程施工等方面协力改善,要达到真正的改善目的,要做到统一协调,有效避免是测、失控等问题的出现。
一、把项目评估、合同签订,作为加强工程项目管理的基础
实行项目评估、项目经理负责制是堵塞项目效益流失的第一道关口。当前不少施工企业对项目评估、测算的地位和作用认识不足;有的评估、测算的权限不明确,方法不科学;有的评估、测算滞后,激励约束不到位,缺乏动态跟踪考核,造成项目管理失控。
为解决好这个问题,必须抓好四个方面的工作:一是提高认识。在思想上切实把项目评估、测算作为加强项目管理的基础,堵塞效益流失的第一道关口来认识,自觉地搞好评估和测算。二是加强评估、测算的组织领导,要成立专门的领导小组,有专人负责,有科学的评估、测算指标体系。三是依法签订承包经营合同,上缴风险保证金、委派主办会计。四是认真进行项目运行中的监督、检查、指导和考核。帮助项目经理及时纠正经营管理偏差,确保项目目标实现。
二、把人力资源的优化配置,作为加强工程项目管理的重点
施工企业要根据工程项目对劳动力的需求情况,在各项目之间,对实现和潜在的劳动力进行周密计划,有效流动,合理调配,充分调动人的积极性和创造性,提高劳动效率。项目经理部要按照动态平衡、统筹优化的原则,建立劳动整体优化、实现劳动力供给与项目需求最佳组合的人力资源管理运行机制,对劳动力的分配和流向作出总体安排,保证劳动力与项目需求的总体平衡,并定期跟踪检查,进行有效监控和及时调整,使劳动力资源得到最大限度的利用。
三、推行项目管理责任制
一般建筑工程项目规模比较大、分项工程或单项工程多,施工管理和合同管理难度大。在精干主体的基础上,还必须进一步减化生产关系,减少管理层次,变金字塔式的管理为扁平式管理。实施工程项目管理有多方面的管理要素,不同的工程项目又有不同的管理重点,但项目管理责任制和项目成本核算制始终是项目管理的核心。它的落实与否,决定着项目管理的效果与成败。项目经理在授权范围内处理和协调甲乙方,总包与分包方、监理方、设计方以及当地政府有关部门等各方面的关系,保证工程项目的协调有序实施。企业内部要用完善的市场机制、用人机制、分配机制、服务机制和监督机制等有效机制来保证项目经理责任制的落实。有效灵活的组织体系是实现工程项目的四控制(进度、质量、安全、成本)、四管理(合同管理、现场管理、信息管理、生产要素管理),保证工程项目三大目标实现的必要条件。建设承包公司对项目部严格按照项目管理的原则和合同履约要求进行资源配置,下达生产计划和各项经济技术各核指标,以保证实现预期的项目管理目标。
四、按进度计划组织,确保工程质量创优
工程进度的控制是一个复杂的系统工程,从工程的整体到局部,由控制计划到控制作业,都需要逐一细化,直到对每个作业点的控制,使项目总进度牢固地建立在局部作业进度控制基础之上。因此,必须综合考虑各方面的因素,制定出科学合理的进度计划,使之有利于实际作业。首先,在计划控制的实施过程中,要严格按照进度计划组织。根据项目经营目标、组织设计和现场情况,编制各作业单元具体执行的作业计划,严格按作业计划进行作业,做到不赶进度、不误工期,按工艺作业,确保工程质量达到优质标准。其次,在作业计划的实施过程中,既要保证进度又要保证质量。要掌握现场实际情况,搞好各工序间的衔接和协调工作,做好记录,排除故障,解决好随时出现的问题,使作业计划能顺利进行,在每个环节中把好质量关。
五、做好技术管理
技术管理是项目管理的重中之重,技术管理不到位,工程质量将无法得到保证。因此,选择一名有经验、有责任心、能力强的总工程师尤为重要,再根据项目需要选配合适的工程部长、工程师、技术员、试验员等岗位人员。技术管理工作要做到规范化、标准化、制度化,满足可追溯的原则。项目部领到图纸后,要立即组织有关人员认真进行自审,熟悉图纸,弄清设计意图、工程特点和施工中可能出现的问题,作好记录,参加业主(监理)主持召开的图纸会审,提出问题,弄清情况;对设计变更应及时办理手续,建立好臺帐;工程各子项目开工前,总工程师要组织施工技术人员就施工项目的内容、技术标准、工程特点、设计意图、施工方案与要求、施工顺序、工期、进度安排、工艺质量标准、设备物资供应的安排、安全质量措施等进行技术交底,对施工队的技术交底要分批、分段进行,派专门的技术人员贯彻控制在整个施工过程中;技术资料要及时、完整、真实,指定专人负责收集竣工所需的技术资料并进行整理、编目、分类、装订成册,为工程交工验收提供依据;技术人员要积极学习和推进新技术的应用,聘请专家对工程出现的技术难题进行会诊解决,开展全员参与技术创新的活动,为工程献计献策。
六、加强工程施工质量安全管理
1、建立质量自检制度
工程质量的优劣牵涉到社会的各个方面,也是一个企业管理水平的综合体现。一般来说任何一个工程建设项且都应当接受企业自身的监督。企业自身监督就要求每个建筑施工企业都应当建立起一个行之有效的质检机制和质量体系,通过自检制度的运行达到质量的持续改进。现行的机制主要是项目部质检员及各施工管理人员项目经理进驻工地监督施工质量,项目部质检员巡查项目质量情况,公司质检科组织定期质量验收,做到层层负责的监督对工程质量把关。
2、加强第三方质量监督
第三方监督指业主(监理)的监督,是目前最权威性的监督。由业主委派或委托的质量监督小组,长驻工地,对工程中尚未施工或正在施工的和已完成施工分部、分项工程及各道工序进行全面监督。现场监督对于施工作业中每道工序做到现场检查发现问题,随时指出并纠正,检查手段采取实测实量和整体观感相结合的方式,已形成的成品有权责令施工人员推倒重来。还可以召集现场管理人员,对施工中普遍存在的问题予以指明,严格对施工工人进行工序技術交底,纠正错误,限时改正。
3、制定安全管理措施
根据施工生产特点、工程特质制定详细的项目安全风险预测及相应的保证措施,并对项目风险进行分解,把安全责任落实到各部门、班组及个人,以便在项目实施全过程更好地管理。加强安全教育及培训,做好生产前的安全技术交底,生产中实行定期或不定期的安全检查,制定切实可行的安全生产预案,做好监管。建筑行业较差的安全管理状况导致了生产率降低、成本上升、工程质量水平降低、建设周期加长等,因此,要始终把”安全第一”作为企业基本经营方针,树立“一切事故都是可以预防并避免”的指导思想,全面开展“事故零目标”推进活动。
4、加强与完善企业内部中的生产要素并配置机制建设
建立与完善工程企业的“五大市场”,即:劳务人才市场、材料的供应市场、机构设备与租赁的市场、资金使用管理市场一结算中心以及技术的市场等内部生产要素必须要有效配置管理体制和运行机制,促进企业资源的有序流动与优化组合。在项目施工过程应推广应用新技术、新工艺、新材料、新设备,提高工程建设的科技含量。企业要加大科技投入,提高技术装备水平。总之,施工项目管理是建筑企业的能量和竞争实力的体现,所以我们要下决心搞好施工项目管理,振兴我们企业,这也是我国建筑改革的出发点、立足点和着眼点。
七、总结
建筑工程施工管理是一项全面、深入细致的工作,它贯穿于施工项目全过程,不仅需要企业管理层的重视和支持,还需要广大员工的积极配合,并以各项规章制度的贯彻和有效措施的执行作保障。只有这样,才能在满足工程建设要求的情况下实现企业经济效益,提高企业施工管理水平。