论文部分内容阅读
对现有的沉桩技术进行了简单比较,列举了沉桩施工中可能遇到的实际问题。并通过实际项目经验,对钓鱼法沉桩施工过程中可能遇到的质量问题进行的分析,并提出预防措施。
A simple comparison is made between the existing pile driving technologies and the actual problems that may be encountered during pile driving construction. Based on the actual project experience, this paper analyzes the quality problems that may occur in the process of fishing piling and puts forward the preventive measures.