改造规模“十一五”期间,国家电网公司将实施电网技术改造项目3.4万项,改扩建输电线路17.79万公里、变压器3.45亿千伏安、断路器10.42万台。提高各级电网输送能力1.3亿千瓦,更新改造不满足运行要求变压器总容量达1.1亿千伏安、输电线路11万公里。2006年,已实施4333项,实现改扩建输电线路16047公里,变压器4300万千伏安,断路器9814台。
Transformation scale “Eleventh Five-Year” period, the State Grid Corporation of China will implement 34,000 power grid technology transformation projects, expansion and expansion of transmission lines 177,900 km, 345 million kVA transformer, circuit breakers 104,200 units . Improve power transmission capacity of 130 million kilowatts at all levels, not meet the operational requirements of the transformation of the total transformer capacity of 110 million kVA, transmission lines 110,000 km. In 2006, 4333 items have been implemented to realize 16,047 km of transmission and transformation lines, 43 million kVA of transformers and 9,814 circuit breakers.