1987年开始了一项研究,以评价影响矿山劳动生产率的各种因素,从而进一步完善地下开采计划。从魁北克省西北部的7个不同矿山搜集了30个可变参数。本文叙述其中一个矿山所取得的一些初步成果;阐述将多元回归分析与优化软件结合,如何具体应用于魁北克省一个矿山的开采计划工作。文章根据该矿一系列的实际生产条件,专门介绍了如何选择铵油炸药和TOVEX(托维克斯梯恩梯敏化浆状炸药)的合适数量而获得最大的爆破矿岩量、最低的爆破成本以及最低的每吨爆破矿石的炸药费用。
A study was started in 1987 to evaluate the various factors that affect the labor productivity of mines to further refine the underground mining program. Thirty variable parameters were collected from seven different mines in the northwestern part of Quebec. This article describes some of the first results achieved by one of the mines; explains how to combine multivariate regression analysis with optimization software and how to apply it specifically to a mine in Québec. Based on a series of actual production conditions of the mine, the article specifically describes how to select the appropriate quantities of ammonium explosives and TOVEX to obtain the maximum blasting rock mass, the lowest blasting cost, and The lowest explosive charge per ton of blasting ore.