5矿山计划在制定矿山战略规划之后,编制了有关露天矿扩帮、排土场、溶浸场和进人通道的详细计划。5.1露天矿计划规定的初始露天矿包括预剥离破碎站的投产,要求在1993年11月剥离出可供堆浸的矿石,包括大约供2年用的堆浸矿石量。然后通过系列扩帮扩大露天矿。所说的露天矿最
5 MINING PLAN Following the preparation of the strategic plan for the mine, a detailed plan has been prepared for the expansion, dumping, flooding and access of open pit mines. 5.1 Open-pit Mines The planned initial open-pit mines include the commissioning of pre-stripping and crushing stations, which require the divesting of heap leachable ore in November 1993, including the heap leach ore for about two years. Then expand the open pit to expand the series of mining. The most open-pit mine