在这次会议上大家座談了勘察設計管理工作,并交流了经驗;主要任务是在提高勘察設計質量的基础上改进勘察设计管理工作。今天談三个問題,請大家研究。一 1959年基本建设对設計工作的要求 (1) 今年基本建設计划经过調整后,战綫縮短了,項目減少了,这样就便于集中力量建成一批工厂,全面投入生产,建成许多车间,局部投入生产,和缓建一些项目,进行整頓工作。調整以后的基本建設任务是不是减輕了呢?不是。下半年的建設任务仍然是很重的。今年上半年完成計划的比例,頂計可达40%,比以往任何年度都多,建設的进度,比以往
At this meeting, we discussed the survey and design management work and exchanged experiences; the main task was to improve survey and design management work on the basis of improving the quality of survey and design. Talk about three issues today and ask everyone to study it. A 1959 Infrastructure Design Requirements (1) After this year’s capital construction plan has been adjusted, the battle lines have been shortened and the number of projects has decreased. This facilitates the concentration of a number of factories, full production, and the establishment of many workshops. Production, and postponement of some projects, to carry out rectification work. After the adjustment, will the basic construction tasks be reduced? No. The construction tasks in the second half of the year are still very heavy. The percentage of plans completed in the first half of this year is up to 40%, more than any previous year, and the progress of construction is more than ever