一、由河南省交通厅科研所设计的洛阳孟津小寨加筋土挡墙已于1985年12月中旬竣工,并于12月26~27日通过静载(超载15%),动载;和聚丙烯拉带的拉拔试验,计划今年二季度组织鉴定。该墙高14.5米,全长57米,采用十字型和L型两种面板;聚丙烯塑料打包带和工业废钢片拉筋。填料为黄色粉质轻亚粘土和红色重亚粘土。他们今年准备在郑州黄河大桥接线处修筑一座长200米左右的加筋土高路堤,目前正在作方案比较。
I. The Luoyang Mengjin Xiaozhai Reinforced Earth Retaining Wall designed by Henan Provincial Communications Department Scientific Research Institute was completed in mid-December 1985 and passed through static load (15% overload) on December 26 and December 27; and Polypropylene pull the pull test, plans the second quarter of this year, tissue identification. The wall height of 14.5 meters, a total length of 57 meters, using cross and L-type two panels; polypropylene plastic packing tape and industrial scrap lacing. The filler is yellowish silty light loam and red heavy-loamy clay. They are planning to build a reinforced embankment with a length of about 200 meters at the junction of the Yellow River Bridge in Zhengzhou this year and are currently making plans for comparison.