2001年11月,国务院批准“十五”期间全国建设包括我省栾川、西峡、卢氏、嵩县、新县等13个县(市)在内的400个水电农村电气化县,13县(市)的水电农村电气化规则,共新增和改善水电装机8万KW。目前,电气化县建设工作部分已开工,有关县(市)都在进行项目的前期工作。结合我省实际情况,就水电前期工作应注意的一些问题谈几点看法供参考。
In November 2001, the State Council approved the construction of 400 hydropower rural electrification counties including 13 counties (cities) including Luanchuan, Xixia, Lushi, Jixian and Xinxian during the 10th Five-Year Plan period. In the 13 counties (cities) of the hydropower rural electrification rule, a total of 80,000 KW of hydropower installed capacity was newly added and improved. At present, the construction work of the electrified county has been started partially, and the county (city) concerned is carrying out the preliminary work of the project. With reference to the actual situation in our province, we will discuss several points of view on the issues that should be taken care of in the preliminary work of hydropower for reference.