论文部分内容阅读
柴油机配件厂(DCW)建厂是1982年开始计划立项的,到1985年,正式投入生产,在过去的四年中,它已在众多的生产单位中建立了独特的地位。 DCW基本上是作为一个修造结合的工厂来建设的。近年来已取得了一些重大的进展和突破。在1988~1989年度内,达到了在某些方面甚至超过了建厂第一阶段所要求的生产指标。生产总值比上一年度有了幅度很大的增长。在1988年4月份,生产总值为6,150,000卢比,1989年1月,已达到
The construction of the Diesel Engine Parts Factory (DCW) started its construction in 1982 and officially went into production by 1985. In the past four years, it has established a unique position among a large number of production units. DCW is basically built as a combined factory. In recent years, some major progress and breakthroughs have been made. During the period from 1988 to 1989, the production targets required in some aspects even exceeded the requirements of the first phase of construction. The gross domestic product has enjoyed a much larger increase than the previous year. In April 1988, the gross domestic product was Rs 6,150,000, which was reached in January 1989