【摘 要】
:
BIM技术为仿古建筑提高了建造品质,在仿古建筑的设计、施工等方面更省力,并且,BIM技术给古建筑带来了更便捷的运营管理。项目概况游览观光阁是公园休息游玩项目(项目建设周期
论文部分内容阅读
BIM技术为仿古建筑提高了建造品质,在仿古建筑的设计、施工等方面更省力,并且,BIM技术给古建筑带来了更便捷的运营管理。项目概况游览观光阁是公园休息游玩项目(项目建设周期为:2012年06月——2013年12月),是一座辽代风格仿古建筑,占地面积一千平方米,方案以“传承孔孟之道,发扬本地文化”为主的设计理念,对建筑的功能、空间、节能、文化等诸多方面进行了深入研究,展现当地的文化风气。项目北京
BIM technology for the antique building to improve the quality of construction, in the antique building design, construction and other aspects of more labor-saving, and BIM technology to ancient buildings to bring more convenient operation and management. Project Overview Tour Sightseeing Court is a park to rest and play the project (project construction period: June 2012 - December 2013), is a Liao Dynasty antique architecture, covers an area of 1,000 square meters, the program to , Carry forward the local culture "based design concept, the building’s function, space, energy saving, culture and many other aspects of an in-depth study to show the local culture. Project Beijing
其他文献
这周是普通话推广周,于是兔子在自家大门上挂了一块兔形的宣传牌子,上面写着“请说普通话”五个大字。深夜,兔子在家睡觉,外面刮起一阵大风,把门上的牌子吹走了,而此时的兔子
Ca_3Co_4O_9/polyaniline bulk composites have been successfully fabricated by ball-milling and hot-pressing method.Our results indicate that the Seebeck coeffici
品读作家王安忆的《我们家的男子汉》一文,我们看到了一个爽气、独立、沉着又不乏天真可爱的小男子汉形象。生活中,我们更希望能够看到一群“小男子汉”们茁壮成长。那么,在
A卷本卷共6道题,每题10分,共计60分.1.解下列方程:(1)2x=x2(精确到0.0001即可);(2)2x=x1000(精确到0.0001即可).解:(1)(Ⅰ)利用TI自带的计算功能可以得出x=-0.7667或x=2或x=4
去年,是石化总公司遇到困难最多的一年,1997年,企业生产建设和资金面临更大困难。在这种形势下,怎样才能克服困难,消化减利因素,把阻力变为前进的动力,对于每一位石化职工来
放学了,我走在小路上,看着落叶像一只只黄蝴蝶翩翩起舞,心里冒出了一个好主意:这么好看的树叶,把它们拿回家做树叶贴画肯定很不错!说干就干,我在地上精心挑选了些树叶,小心
在瞬时沉降或最终沉降计算中,都要用到土的变形模量E0,由于室内试验和原位测试方面存在的困难,过去对变形模量研究的报导有限。本文用载荷试验结果证明了变形模量具有非线性特征。
能中铝公司不断进行管理创新,探索并建立了“集中管理、统一经营”模式,对营销和财务实行集中管理,对大宗原辅材料实行集中招标采购,发挥了集约化经营优势。
Chinalco can c
阳春三月,暖暖的春风飞过大地,伴着清新的花草气息将新的希望播撒人间。在这个充满生命力的美妙季节里,让我们用心去感受大自然的美景吧!
Spring March, the warm spring wi
春节前夕,虞城县人口计生委、计生协充分利用农民工大量返乡的有利时机,将“六个一”优质服务套餐送给返乡农民工。
On the eve of the Spring Festival, the Yucheng Count