山东张店钢铁厂四座100米~3高炉,为了适应提高产量、增加料批的需要,十年来陆续将单料车改为双料车上料,使用情况良好。由于炉顶空间位置狭小,在不影响炉顶金属结构和煤气管道的情况下,将原斜桥的结构尺寸适当加大。又由于炉顶布料器及其受料斗的限制,使双料车不能分别在两个平行的位置卸料,因此,在斜桥上铺设了交叉轨道,以使双料车能处于接近单料车时的同一个卸料位置。斜桥轨道的铺设(图1),是从下部双料车装料位置的平行轨道开始,到料车全行程长度的约1/3处进入弯道,在约2/3处形成内侧两条钢轨的交叉固定道岔,然后,通过反向弯道,直至进入卸料曲轨段之前,形成两侧各两条钢轨相邻的平行轨
In order to meet the need of increasing the output and increasing the material batch, four steel plants of 100 meters ~ 3 in Zhangdian Iron & Steel Factory of Shandong Province have been changing the single-piece car to double-piece car in ten years and are in good condition. Due to the narrow roof space, the structural dimension of the original inclined bridge is appropriately enlarged without affecting the metal structure and the gas pipeline on the roof. Due to the restriction of the top distributor and the hopper, the double-carts can not be unloaded respectively in two parallel positions. Therefore, a crossed track is laid on the inclined bridge so that the double-cart can be close to the single-cart Same unloading position. Diagonal bridge track laying (Figure 1), is from the lower double-car loading parallel track location, to the skip the entire length of about one-third into the corner, at about 2/3 to form the inner two rails Of the cross-fixed turnout, and then, through the reverse curve, until it enters the discharge curve section, the formation of two rails adjacent to each other on both sides of the parallel rails