论文部分内容阅读
国家“六五”科研项目之一——5000 t 重载列车成套技术的研究,经过两年努力,于1984年7月16日至8月4日,在大同至秦皇岛之间进行了运营试验。20多天中,往返开行列车12次,行程8400多公里,进行了一系列试验,包括列车静置试验;起动试验;非常制动试验;车钩强度试验;装卸车测试;内燃机车单机、双机牵引试验等。大量试验数据和理论分析说明,我国自己制造的内燃机车和车辆等组成的重载列车试验是成功的。
After two years of hard work, one of the national “Sixth Five-Year” research projects - the study of the complete set of technology for the 5000t heavy-haul train, conducted operational tests between Datong and Qinhuangdao from July 16 to August 4, More than 20 days, round-trip train 12 times, more than 8400 kilometers of travel, conducted a series of tests, including the train static test; Start test; Braking test; Coupling strength test; Traction test and so on. A large number of experimental data and theoretical analysis show that China’s own manufacture of diesel locomotives and vehicles composed of heavy-haul train tests were successful.