铸钢车间中的电爐位置,在保证工艺操作和钢水质量的情况下,还要考虑与土建、电力、通风、给排水等设计的关系,使多方面都达到经济合理。10吨以上的电爐,如ДСВ—10型或ДСВ—20型的电爐,有复杂的油压系统以及电气装置,往往设有地下室,这就要求考虑更多的问题。电爐布置一般应满足下述要求: (1) 电爐应接近爐料仓库,运料要方便;接近合箱、浇铸工段,运钢水方便;另外并要考虑出渣方便等。因此,在布置时应使这些工序能在吊车操作的地区内进行。 (2) 保证吊车能吊起爐盖、电极、爐衬和修爐材料等,并能运至需要的地区。 (3) 电爐和电爐变电所地区要有良好的通风;国内机械制造厂铸钢车间电爐利用自然通风的较多。 (4) 有关土建公用设计应该经济合理。地下水(?)深度影响电爐标高的决定。
The position of the electric furnace in the steel casting workshop must also consider the relationship with civil engineering, power, ventilation, water supply and drainage, etc., in order to ensure the technical operation and the quality of molten steel, so that it can be economically reasonable in many aspects. More than 10 tons of electric furnaces, such as ДСВ-10 or ДСВ-20 electric furnaces, have complex hydraulic systems and electrical devices, often with basements, which requires more consideration. The layout of the electric furnace should generally meet the following requirements: (1) The electric furnace should be close to the charge warehouse, and the transport material should be convenient; close to the box, casting section, convenient transport of molten steel; in addition to consider the convenience of slag. Therefore, the arrangement should be such that these processes can be performed in the area where the crane operates. (2) Ensure that the crane lifts the lid, electrodes, linings and repair material, etc., and can reach the required area. (3) Electric furnaces and electric furnace substations should be well ventilated; domestic steel mills use more naturally ventilated steel furnaces. (4) The civil works design should be economically reasonable. The depth of groundwater (?) affects the decision of the elevation of the electric furnace.