论文部分内容阅读
山西省国税局业务综合楼劲性钢筋混凝土柱施工中,成功地解决了钢结构长焊缝的焊接变形,以及现场安装和型钢混凝土柱的模板、钢筋、混凝土工程的施工难点等问题。
During the construction of the reinforced concrete column of the Comprehensive Building of the Shanxi Provincial Inland Revenue Bureau, the welding deformation of the long weld of the steel structure was successfully solved, as well as the construction difficulties of the installation of the steel reinforced concrete column, the reinforcement of the steel concrete, and the concrete construction.