我区今冬明春水利建设在党的八届八中全会的伟大号召下,棍据今年全国农田水利和水土保持工作会议的精神,省的指示,结合本区特点,初步规划1960年的任务为:现有水利设施在普修的基础上,重点整修扩建山塘河坝17万多处,新建中小型水库2,000座(其中续修中型工程26处)一般工程5,000多处,发展抽水机15,000匹马力,初步控制水土流失面积530平方公里,基本控制865平方公里,水能出力15,000匹马力,其中发电8,000瓩,新建主要干、支渠长5,600公里,防洪工程208处。计划土石方1亿立方米,劳动日5,000万个,增加引蓄水量5亿立方米,扩大
In this winter and spring and spring of spring water conservancy construction in our district, under the great call of the Eighth Plenary Session of the Eighth Party of the Party, according to the spirit of this year’s National Conference on Farmland Water Conservancy and Soil and Water Conservation, the instructions of the province, combined with the characteristics of the region, the preliminary planning of the 1960 task is : The existing water conservancy facilities will be built on the basis of general repairs, focusing on the renovation and expansion of more than 170,000 Santang River dams, the construction of 2,000 small and medium-sized reservoirs (including 26 renewal mid-level projects), more than 5,000 general works, and the development of 15,000 horsepower pumps. The initial control of soil erosion area is 530 square kilometers, basic control is 865 square kilometers, water power output is 15,000 horsepower, among which power generation is 8,000 tons, new main stem and branch canal length is 5,600 kilometers, and 208 flood prevention projects. Plan 100 million cubic meters of earth and stone, 50 million labor days, increase water storage capacity by 500 million cubic meters, expand