美国急需新的军用反应堆

来源 :国外核新闻 | 被引量 : 0次 | 上传用户:hellogph
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
【美国《核子周刊》1988年3月10日报道】美国能源部打报告给国会说,“急需”新的产氚军用反应堆,以便替代老化的军用堆。能源部一些设施的安全问题日益突出,至少需要一座新的军用堆。华盛顿州汉福德厂N堆因老化,将列为备用堆,三座“萨凡纳河”反应堆由于安全问题正在以设计功率的半功率运行。“萨凡纳河C堆”因反应堆容器裂纹无法修理而停堆。 [United States “Nuclear Weekly” reported on March 10, 1988] The U.S. Department of Energy reported to the National Assembly that “an urgent need” is for a new military parakeet to replace the aging military heap. The safety issues at some DOE facilities have become increasingly prominent and at least one new military reactor is needed. The N reactor at Hanford, Wash., will be classified as a backup reactor due to aging. The three “Savannah River” reactors are operating at half power of the designed power due to safety issues. The “Savannah C reactor” was shut down because the cracks in the reactor vessel could not be repaired.
其他文献
我厂是生产柴油机、柴油机发电机组和柴油机上用的喷油泵、喷油器的专业工厂,是我国机械行业的重点骨干企业之一。截至去年6月底,工厂有职工9459人。其中专业工程技术人员75
柳州工程机械厂在1987年积极开展“双增双节”运动,加强能源科学管理,取得了较好的经济效益。一、生产和节能,经济效益基本概况 1.1987年该厂生产各种型号装载机共1065台,比
【《瑞士原子能协会通报》1988年第1期第14页报道】迄今为止,法国电力公司压水堆的燃料组件在堆内停留时间为3年,每年换料一次,换掉1/3燃料组件。燃料在堆内停留时间即将改
引言大量生产为近代工业的主要生产方式。其决定性条件为零件应具有互换性,亦即零件品质变化在一定范围之内;换言之零件须具一定之公差。本文将讨论合理的设计公差问题。所
【美国《化学、生物、辐射/原子事件军事记录》1988年第 1期第16页报道】核材料生产预算主要以总统每年批准的《核武器储备备忘录》中规定的氚、钚和浓缩铀需要量为依据。《
【英国《国际核工程》1987年9月号第3页报道】苏联向印度出口440Mwe 型压水堆即将达成协议。印度一高级科学家委员会最近根据其总理拉吉夫·甘地的要求,撰写了一篇报告,报告
铁路是我国大交通网中的重要运输工具之一,是国民经济大动脉。中央领导同志多次深入现场视察,国务院批准铁路实行投入产出、以路建路经济承包责任制,极大地鼓舞和鞭策我们深
请下载后查看,本文暂不支持在线获取查看简介。 Please download and view, this article does not support online access to view profile.
中国法制报社工程是个建筑群体,包括两栋宿舍楼和综合楼、多功能厅、印刷厂房及锅炉房、变电室等附属工程。其中7~#、8~#两栋外砖内模宿舍楼均为六层,建筑面积共计8590m~2,
【美国《国际先驱论坛报》和英国《卫报》1987年11月18—20日报道】伊朗德黑兰电台广播说,1987年11月17日上午10点15分,伊拉克军用飞机轰炸了座落在伊朗南部布歇赫尔的一座