摘要:新中国成立60多年来,特别是改革开放以来,小浪底、二滩、葛洲坝、三峡等一批世界级水电站的建设,标志着中国已逐步进入世界水电建设前列。目前,我国是世界上水电工程在建规模最大的国家,是水电发展速度最快的国家,但是在具体的水利水电工程中施工我们仍存在不少的问题,因此加强技术管理是摆在相关工程人员面前一个十分重要的问题。
关键词:水利水电工程;施工技术;管理
Abstract: since the founding of for over 60 years, especially since the reform and opening, xiaolangdi, gezhouba ertan, and a number of world class, the three gorges hydropower station construction, marks China's already gradually entered the world of hydropower construction front row. At present, our country is the world largest hydropower project under construction in the country, is the quickest countries hydropower development, but in the construction of water conservancy and electricity we still exist many problems, so strengthening technical management is in related engineering personnel face a very important problem.
Key words: the hydropower project; Construction technology; management
中圖分类号:TV文献标识码:A 文章编号:
引言
水利水电工程建设存在工程规模大,建设周期长,施工技术复杂,质量要求高,工期限制严格,以及工作环境艰苦、不安全因素相对较多等特点,技术管理是对水利水电工程建筑施工中的一切技术活动进行科学的管理和严密的组织,使科技转化为生产力,从而提高经济效益。当前我国水利水电工程建筑的施工技术问题,一是内部生产经营管理粗放,缺乏激励机制,二是传统就业制度过于包容,致使企业人员文化程度低、技术素质差,大部分职工末受正规培训,缺乏应有的知识。因此如何建立有效的施工技术管理体系,从而对水利水电工程建筑的施工前和施工过程中进行科学的技术管理,是一项迫在眉睫的课题。
一、水利水电工程常用施工技术
1.1 地下混凝土防渗墙施工技术
(1)射水法造墙技术。射水法造墙机不断进行更新换代,目前投入使用的射水法“三代机”可适用于粒径≤80mm左右砂石卵石地基处理,墙深≤30m,墙厚0.22—0.60m,其垂直度≤1/300.这项技术为我国在砂土地基中建造混凝土防渗墙提供了一种速度快、成本低质量可靠、施工简便的方法与机械,在国内外得到迅速推广应用。
(2)塑性混凝土防渗墙施工技术。塑性混凝土是一种以膨润土、粘土等掺合料取代大部分水泥而形成的柔性防渗墙体材料,具有弹模低、极限变形大的特点。
1.2 混凝土坝施工技术
近十几年来,大中型水电工程普遍采用先进的混凝土拌和设备和与之相配套的混凝土运输、浇筑设备,使混凝土施工达到较高的机械化水平。
(1)水工模板技术。混凝土坝施工的模板技术,在近20年有较快的发展,钢模板、竹木胶合板已大量取代木模板,模板的型式也大量采用滑升模板、悬臂模饭及预制混凝土模板等。
(2)混凝土“双掺”技术。①混凝土的掺合料:坝体混凝土掺粉煤灰,可大量节约水泥,改善混凝土和易性,增强混凝土密实性,降低混凝土绝热温升,提高抗裂性能等。20世纪80年代初以来,在大中型水坝施工中大力推广掺粉煤灰技术,仅存碾压混凝上中掺量达50-70%,在常态混凝土的掺量一般也可以达到20-30%。②混凝土的外加剂:坝体混凝土掺不同类型的外加剂是改善混凝土质量和性能、节约水泥用草和降低成本的有效措施,普遍采用合适的外加剂,如减水剂 缓凝剂、防裂膨胀剂、脱模剂、泵送剂等。
(3)碾压混凝土坝施工技术。施工的碾压混凝士坝普遍采用高掺粉煤灰技术,在早期水坝施工时的试验表明,碾压混凝土粉煤灰的掺量可以达到50-60%左右。由于高掺粉煤灰技术的不断成熟,使得水泥用量节省,坝体温升减少,达到不裂不渗、降低工程造价的良好效果。
(4)碾压混凝土的铺筑工艺。①薄层铺筑:早期碾压坝主要采用入仓面薄层铺筑工艺,混凝土施工强度要求高,当混凝土暴露时间超过初凝时间须按施工缝的标准进行层间处理。②斜层平推铺筑:此工艺可以大大缩短碾压混凝土层间隔时间,彻底解决碾压混凝土层面结合问题,也有利于夏季和雨季施工。③高温季节碾压混凝土的施工:主要方法足采取简易温控措施以及加快层面混凝土覆盖速度,以达到降低混凝土入仓温度和提高层间胶结强度。
1.3 砌石拱坝施工技术
(1)坝面的砌筑。坝面的砌筑丰要以外形美观和防渗为主,坝面一般采用经过细加工的条石及强度等级为M10的砂浆砌筑。这种方法成本高、速度慢分砌石拱坝的面石采用统一规格,砌筑时按设计坝面不同坡度采用挑出或缩进的“倾斜安砌法”砌筑。砌石双曲拱坝面石一般采用丁砌,座浆法砌筑,并要求砌体达到平整稳定、错缝、上游坝面的砂浆深勾缝是防止大坝漏水的第一道防线,一股用强度等级为M10的砂浆进行深勾缝。
(2)坝腹的砌筑。坝腹的砌体足防止大坝渗漏的第一道防线。腹石石料多数采用块石或乱块石直立竖向摆放砌筑,对石料强度要求从严,形状从宽,边长不超过1m为宜;混凝土一般用强度等级为C10-C15的细骨料混凝土,为改善混凝土的和易性,节省水泥,混凝土拌制时一般掺适量的减水剂和掺量为20-30%的粉煤灰。
(3)基础混凝土垫层的施工。砌石拱坝基础混凝土垫层以抗裂、防渗为主,混凝土强度等级比砌体略高,一般为C10-C20,厚度为1-2m。两岸基础混凝土垫层一般待砌体升高一至两层后才浇筑,浇筑前应对仓面进行常规施工缝处理。对于岸坡坡度大于60°的拱坝基础,有些工程采用补偿收缩混凝土垫层,因为补偿收缩混凝土垫层的微膨胀而产生的自应力加强了砌石坝砌体与基岩之间紧密挤压结合,提高抗渗能力。
1.4 水库土坝防渗加固处理措施
许多病险水库的土坝坝后坡会出现渗水、湿润、跌窝等现象,导致土坝变形、渗漏,危及水库的安全运行,应及时采取防渗加固处理措施,消除工程隐患。
解决土坝的变形和渗透问题,可对坝体进行劈裂灌浆和对坝肩、坝底基岩进行帷幕灌浆,使坝体内形成连续的防渗体,从而降低坝体浸润线,消除坝后坡的严重渗漏,使坝体趋于稳定,最终达到除险加固之目的。
土坝坝体劈裂灌浆可根据土坝实际情况布置两排灌浆孔。主排孔沿坝轴线布置副排孔布置在坝轴线上游1.5m处,两排孔交错布置,孔距均为3-5m,灌浆孔要尽可能穿透坝体底部的残坡积层深人到坝基,以形成一个连续的竖直防渗体。
对坝肩、坝底基岩进行帷幕灌浆时,也是布置两排灌浆孔。主排孔沿坝轴线布置副排孔布置在坝轴线上游1.5m处。两排孔交错布置,孔距均为3-4m,灌浆孔要穿透弱风化带进入到微风化岩相对隔水层。采用回转方法成孔,孔内下塞,纯压式灌浆,自上而下分段,孔口封闭,孔内循环。帷幕灌浆注浆材料可采用425#普通硅酸盐水泥,制成纯水泥浆后在设计压力下灌注。
二、现代化水利水电工程施工管理措施
引起水利水电工程施工项目的质量问题因素复杂,包括盲目套用图纸、荷载取值过小,内力分析有误、施工偷工减料、建筑材料及制品不合格,擅自代用材料等众多因素,这就为分析、判断和处理因素增加困难,所以保证质量必须从多个环节入手。
2.1 施工前的质量控制
这一环节,首先要对施工地点进行严格的科学的设计和勘探,在这一过程中,要严格的按照法律法规进行。在这一环节的过程中要建立严格的各级质量责任制,真正做到层层把关,各司其责,责任到人。
2.2 施工过程中的控制
(1)要严格控制原材料的质量。原材料的质量决定了建筑的质量,只有有了符合要求的高质量的材料才能够保证建筑的质量。严禁将不合格的材料用于施工工程,一旦发现未经检验或试验不合格的材料使用到工程上,监理人员应立即制止,对于不做更改的或者屡次被劝告的,报上级主管部门并责令其停止施工,给予一定的惩罚。
(2)严格控制隐蔽工程的质量。这一环节中一定要做好验收,保证地基土符合要求然后再及时办好隐蔽验收签证手续。
(3)施工过程中要坚持固定抽查与巡查确保工程的质量。巡查过程中要充分关注那些在容易出现问题的环节和人民群众反映强烈的工程质量问题,巡查过程不仅可以发现施工过程中存在的问题还能起到监督和威慑作用。
2.3 做好施工后质量控制
施工后的质量监督管理是建设工程投入使用的把关监督管理。这一环节能够确保投入使用的工程是合格的,这其中首先要做到的是确保验收的质量,其次在做好监理交底工作的同时加强对水利水电工程的质量监督管理,使建设工程全寿命期内的质量目标得到有效实现,为用户创造安全、舒适、健康的生产、生活环境,使建设工程质量实现可持续发展。
2.4 施工中的成本控制
质量是水电站建设的保证但是在水电站建设的过程中还要注意控制成本。在市场经济条件下,施工企业之间的竞争日趋激烈,如何加强内部管理,提高经济效益,成为每个施工企业的根本目标更关系到施工企业的生命。这两种成本中施工成本占百分之七十以上。
三、结束语
水利水电工程建筑的施工需要同时通过不同的方式提高其技术和管理,才会发挥水利水电工程建筑的应有作用,所以在施工中,技术和管理要相互通过不同的方式使用,并高度重视他们的交互使用才会使工程发挥应有作用。
参考文献
[1] 王平平.浅议水利工程施工管理[J].中国水运.2007.
[2] 侯才水.水电工程项目法施工管理的问题及对策[J].水利科技,2000.
[3] 畢红春.浅议施工企业项目成本管理体系及控制[J].科技创业月刊,2005.
[4]王祖印,吴优,王树海.水利水电企业现代化管理模式初探[J].中国高科技术企业,2009.
关键词:水利水电工程;施工技术;管理
Abstract: since the founding of for over 60 years, especially since the reform and opening, xiaolangdi, gezhouba ertan, and a number of world class, the three gorges hydropower station construction, marks China's already gradually entered the world of hydropower construction front row. At present, our country is the world largest hydropower project under construction in the country, is the quickest countries hydropower development, but in the construction of water conservancy and electricity we still exist many problems, so strengthening technical management is in related engineering personnel face a very important problem.
Key words: the hydropower project; Construction technology; management
中圖分类号:TV文献标识码:A 文章编号:
引言
水利水电工程建设存在工程规模大,建设周期长,施工技术复杂,质量要求高,工期限制严格,以及工作环境艰苦、不安全因素相对较多等特点,技术管理是对水利水电工程建筑施工中的一切技术活动进行科学的管理和严密的组织,使科技转化为生产力,从而提高经济效益。当前我国水利水电工程建筑的施工技术问题,一是内部生产经营管理粗放,缺乏激励机制,二是传统就业制度过于包容,致使企业人员文化程度低、技术素质差,大部分职工末受正规培训,缺乏应有的知识。因此如何建立有效的施工技术管理体系,从而对水利水电工程建筑的施工前和施工过程中进行科学的技术管理,是一项迫在眉睫的课题。
一、水利水电工程常用施工技术
1.1 地下混凝土防渗墙施工技术
(1)射水法造墙技术。射水法造墙机不断进行更新换代,目前投入使用的射水法“三代机”可适用于粒径≤80mm左右砂石卵石地基处理,墙深≤30m,墙厚0.22—0.60m,其垂直度≤1/300.这项技术为我国在砂土地基中建造混凝土防渗墙提供了一种速度快、成本低质量可靠、施工简便的方法与机械,在国内外得到迅速推广应用。
(2)塑性混凝土防渗墙施工技术。塑性混凝土是一种以膨润土、粘土等掺合料取代大部分水泥而形成的柔性防渗墙体材料,具有弹模低、极限变形大的特点。
1.2 混凝土坝施工技术
近十几年来,大中型水电工程普遍采用先进的混凝土拌和设备和与之相配套的混凝土运输、浇筑设备,使混凝土施工达到较高的机械化水平。
(1)水工模板技术。混凝土坝施工的模板技术,在近20年有较快的发展,钢模板、竹木胶合板已大量取代木模板,模板的型式也大量采用滑升模板、悬臂模饭及预制混凝土模板等。
(2)混凝土“双掺”技术。①混凝土的掺合料:坝体混凝土掺粉煤灰,可大量节约水泥,改善混凝土和易性,增强混凝土密实性,降低混凝土绝热温升,提高抗裂性能等。20世纪80年代初以来,在大中型水坝施工中大力推广掺粉煤灰技术,仅存碾压混凝上中掺量达50-70%,在常态混凝土的掺量一般也可以达到20-30%。②混凝土的外加剂:坝体混凝土掺不同类型的外加剂是改善混凝土质量和性能、节约水泥用草和降低成本的有效措施,普遍采用合适的外加剂,如减水剂 缓凝剂、防裂膨胀剂、脱模剂、泵送剂等。
(3)碾压混凝土坝施工技术。施工的碾压混凝士坝普遍采用高掺粉煤灰技术,在早期水坝施工时的试验表明,碾压混凝土粉煤灰的掺量可以达到50-60%左右。由于高掺粉煤灰技术的不断成熟,使得水泥用量节省,坝体温升减少,达到不裂不渗、降低工程造价的良好效果。
(4)碾压混凝土的铺筑工艺。①薄层铺筑:早期碾压坝主要采用入仓面薄层铺筑工艺,混凝土施工强度要求高,当混凝土暴露时间超过初凝时间须按施工缝的标准进行层间处理。②斜层平推铺筑:此工艺可以大大缩短碾压混凝土层间隔时间,彻底解决碾压混凝土层面结合问题,也有利于夏季和雨季施工。③高温季节碾压混凝土的施工:主要方法足采取简易温控措施以及加快层面混凝土覆盖速度,以达到降低混凝土入仓温度和提高层间胶结强度。
1.3 砌石拱坝施工技术
(1)坝面的砌筑。坝面的砌筑丰要以外形美观和防渗为主,坝面一般采用经过细加工的条石及强度等级为M10的砂浆砌筑。这种方法成本高、速度慢分砌石拱坝的面石采用统一规格,砌筑时按设计坝面不同坡度采用挑出或缩进的“倾斜安砌法”砌筑。砌石双曲拱坝面石一般采用丁砌,座浆法砌筑,并要求砌体达到平整稳定、错缝、上游坝面的砂浆深勾缝是防止大坝漏水的第一道防线,一股用强度等级为M10的砂浆进行深勾缝。
(2)坝腹的砌筑。坝腹的砌体足防止大坝渗漏的第一道防线。腹石石料多数采用块石或乱块石直立竖向摆放砌筑,对石料强度要求从严,形状从宽,边长不超过1m为宜;混凝土一般用强度等级为C10-C15的细骨料混凝土,为改善混凝土的和易性,节省水泥,混凝土拌制时一般掺适量的减水剂和掺量为20-30%的粉煤灰。
(3)基础混凝土垫层的施工。砌石拱坝基础混凝土垫层以抗裂、防渗为主,混凝土强度等级比砌体略高,一般为C10-C20,厚度为1-2m。两岸基础混凝土垫层一般待砌体升高一至两层后才浇筑,浇筑前应对仓面进行常规施工缝处理。对于岸坡坡度大于60°的拱坝基础,有些工程采用补偿收缩混凝土垫层,因为补偿收缩混凝土垫层的微膨胀而产生的自应力加强了砌石坝砌体与基岩之间紧密挤压结合,提高抗渗能力。
1.4 水库土坝防渗加固处理措施
许多病险水库的土坝坝后坡会出现渗水、湿润、跌窝等现象,导致土坝变形、渗漏,危及水库的安全运行,应及时采取防渗加固处理措施,消除工程隐患。
解决土坝的变形和渗透问题,可对坝体进行劈裂灌浆和对坝肩、坝底基岩进行帷幕灌浆,使坝体内形成连续的防渗体,从而降低坝体浸润线,消除坝后坡的严重渗漏,使坝体趋于稳定,最终达到除险加固之目的。
土坝坝体劈裂灌浆可根据土坝实际情况布置两排灌浆孔。主排孔沿坝轴线布置副排孔布置在坝轴线上游1.5m处,两排孔交错布置,孔距均为3-5m,灌浆孔要尽可能穿透坝体底部的残坡积层深人到坝基,以形成一个连续的竖直防渗体。
对坝肩、坝底基岩进行帷幕灌浆时,也是布置两排灌浆孔。主排孔沿坝轴线布置副排孔布置在坝轴线上游1.5m处。两排孔交错布置,孔距均为3-4m,灌浆孔要穿透弱风化带进入到微风化岩相对隔水层。采用回转方法成孔,孔内下塞,纯压式灌浆,自上而下分段,孔口封闭,孔内循环。帷幕灌浆注浆材料可采用425#普通硅酸盐水泥,制成纯水泥浆后在设计压力下灌注。
二、现代化水利水电工程施工管理措施
引起水利水电工程施工项目的质量问题因素复杂,包括盲目套用图纸、荷载取值过小,内力分析有误、施工偷工减料、建筑材料及制品不合格,擅自代用材料等众多因素,这就为分析、判断和处理因素增加困难,所以保证质量必须从多个环节入手。
2.1 施工前的质量控制
这一环节,首先要对施工地点进行严格的科学的设计和勘探,在这一过程中,要严格的按照法律法规进行。在这一环节的过程中要建立严格的各级质量责任制,真正做到层层把关,各司其责,责任到人。
2.2 施工过程中的控制
(1)要严格控制原材料的质量。原材料的质量决定了建筑的质量,只有有了符合要求的高质量的材料才能够保证建筑的质量。严禁将不合格的材料用于施工工程,一旦发现未经检验或试验不合格的材料使用到工程上,监理人员应立即制止,对于不做更改的或者屡次被劝告的,报上级主管部门并责令其停止施工,给予一定的惩罚。
(2)严格控制隐蔽工程的质量。这一环节中一定要做好验收,保证地基土符合要求然后再及时办好隐蔽验收签证手续。
(3)施工过程中要坚持固定抽查与巡查确保工程的质量。巡查过程中要充分关注那些在容易出现问题的环节和人民群众反映强烈的工程质量问题,巡查过程不仅可以发现施工过程中存在的问题还能起到监督和威慑作用。
2.3 做好施工后质量控制
施工后的质量监督管理是建设工程投入使用的把关监督管理。这一环节能够确保投入使用的工程是合格的,这其中首先要做到的是确保验收的质量,其次在做好监理交底工作的同时加强对水利水电工程的质量监督管理,使建设工程全寿命期内的质量目标得到有效实现,为用户创造安全、舒适、健康的生产、生活环境,使建设工程质量实现可持续发展。
2.4 施工中的成本控制
质量是水电站建设的保证但是在水电站建设的过程中还要注意控制成本。在市场经济条件下,施工企业之间的竞争日趋激烈,如何加强内部管理,提高经济效益,成为每个施工企业的根本目标更关系到施工企业的生命。这两种成本中施工成本占百分之七十以上。
三、结束语
水利水电工程建筑的施工需要同时通过不同的方式提高其技术和管理,才会发挥水利水电工程建筑的应有作用,所以在施工中,技术和管理要相互通过不同的方式使用,并高度重视他们的交互使用才会使工程发挥应有作用。
参考文献
[1] 王平平.浅议水利工程施工管理[J].中国水运.2007.
[2] 侯才水.水电工程项目法施工管理的问题及对策[J].水利科技,2000.
[3] 畢红春.浅议施工企业项目成本管理体系及控制[J].科技创业月刊,2005.