六十至七十年代,广西先后建成六座中型水电站(装机2.5—25万千瓦),七十年代后五年,小水电也曾有很快的发展。自进入八十年代,由于种种原因,我区中小型水电建设速度骤减,“六五”期间,小水电净增装机仅11.16万千瓦,年均增长率2.78%;中型水电站在此五年内只有恶滩一处投产,而“七·五”期间再无具体安排;大型大化
From the sixties to the seventies, six medium-sized hydropower stations (2.5 to 250,000 kilowatts installed) were built in Guangxi. In the five years after the 1970s, small hydropower also had rapid development. Since entering the 1980s, due to various reasons, the construction speed of small and medium-sized hydropower in our region has dropped sharply. During the “6th Five-Year Plan” period, the net addition of small hydropower generators was only 111,600 kilowatts, with an average annual growth rate of 2.78%; medium-sized hydropower plants only have five years The evil beach was put into production at one place, and there was no specific arrangement during the “July 5th” period;