——焦作铝厂电厂 这是一家2x125MW燃煤电厂,施工始于1995年第一季度,第一台机组已于1997年夏天投入运行。该电厂归属于爱依斯与焦作铝厂组建焦作万方电力有限公司,总投资为1.518亿美元,注册资本5370万美元。爱依斯公司已承诺
Jiaozuo Aluminum Plant Power Plant This is a 2x125MW coal-fired power plant. Construction started in the first quarter of 1995. The first unit was put into operation in the summer of 1997. The power plant is owned by AES and Jiaozuo Aluminum Plant and established Jiaozuo Wanfang Power Co., Ltd. with a total investment of US$151.8 million and a registered capital of US$53.7 million. AES has promised