汉江丹江口水利枢纽二期围堰截流合龙工程,在1959年12月26日,经过3小时零10分的紧张战斗,业已胜利完成。这是党中央和毛主席正确领导的胜利;是党的总路线的胜利。也是工地党委领导着十万劳动大军,充分运用高速度施工和两条腿走路的方针所获得的伟大创举。丹江口工程,当右岸第一期围堰胜利完成之后,左岸截流工程便于1959年11月1日提前下河,在宽达180多米的江面上,先将右非龙口部分筑起了一条雄伟的堆石堤,屹立于江心,并用大石块作成堆石里头,然后由左岸端进,形成龙口。合龙之初,龙口已缩狭为24米宽(注1);水面宽只有15米,流量为320秒公方。当截流合龙命
Hanjiang Danjiangkou hydro-junction II cofferdam closure project, in December 26, 1959, after 3 hours and 10 minutes of intense fighting, has been completed successfully. This is the victory of the correct leadership of the CPC Central Committee and Chairman Mao. It is the triumph of the party’s general line. It is also a great undertaking made by the party committee of work site that leads the workforce of 100,000 and makes full use of the high-speed construction and walking with two legs. Danjiangkou project, when the right bank after the completion of the first phase of the cofferdam, the left bank closure project to facilitate early November 1, 1959 down the river, at a width of more than 180 meters of the river, the first non-part of the right non-erected a majestic pile Stone embankment, standing in the heart of the river, and made of large stones inside the rock, and then into the left bank, the formation of Longkou. At the beginning of the dragon, Longkou has been narrowed to 24 meters wide (Note 1); the water is only 15 meters wide, the flow rate of 320 seconds of the public. When the interception closure dragon life