论文部分内容阅读
水利水电工程执行概算是工程造价控制的重要手段,根据不同的阶段和不同的方法编制的执行概算会对工程建设起不同的作用。只有紧密结合工程建设的实际情况,客观充分地考虑设计、环保、水保、工程所在地的风俗等等因素对工程造价产生的影响,才能保证执行概算科学合理,才能对工程造价控制产生积极作用,才能保证投资方控制考核项目公司的目标实现。
The implementation of the water conservancy and hydropower project budget estimates is an important means of project cost control, according to different stages and different methods of implementation of the proposed budget will play a different role in the construction. Only in close connection with the actual construction of the project objectively and fully consider the design, environmental protection, water and soil conservation, the location of the project and other factors on the project cost impact in order to ensure the implementation of scientific estimates are reasonable in order to control the project cost has a positive effect, To ensure that investors control the company to achieve the goal of assessment projects.