改革开放以来,我省工农业用电急速上升,电力建设发展速变很快,一此新的变电站和输电线路在我省相继建成。在变电站工程中,除新建工程项目外,还对过去建设的部分变电站进行了扩建和改建,有的变电站在原110kV电压等级基础上,新建220kV部分;有的变电站进行了设备增容改造和旧设备更新换代。对带电运行下的变电站改建和扩建,是一项技术难度较大的施工。特别是在带电运行下变电站的改建施工,上部空间受电气设备引线的限制,有时前后左右都受到设备及其安全范围的限制,使施工更为困难,因此,保证站内
Since the reform and opening up, the province’s industrial and agricultural electricity use has rapidly increased, and the development of electric power construction has undergone rapid changes. As a result, new substations and transmission lines have been completed in our province. In the substation project, in addition to the new construction project, some substations built in the past were also expanded or rebuilt. Some substations were built on the basis of the original 110kV voltage level and a new 220kV section was built; some substations were equipped with capacity expansion and old equipment. Replacement. The reconstruction and expansion of substations under live operation is a technically difficult construction. Especially in substation reconstruction under electrified operation, the upper space is limited by the lead wire of the electrical equipment. Sometimes the front, back, and left are restricted by the equipment and its safety range, making the construction more difficult. Therefore, the station is guaranteed.