印渚电站系浙江省桐庐县首家股份制小水电站,由桐庐县水利局、县供电局、省水电开发实业公司等6家单位合股,总投资5300万元,安装4台2000kW机组,预计年发电量2500万kWh。该电站位于印渚境内,紧靠桐千公路。在桐庐县与临安县交界的天目溪上建高15m长235m拦水堰坝,设15块自动调节水位的翻板闸门。 该电站于1994年11月破土动工兴建,施工单位克服区域性大断层地段施工及洪水灾害等种种困难,比原计划提前1个月竣工。它的建成对缓解桐庐县山区用电矛盾,推动经济奔小康起了积极作用。
The Indian-Israel Power Station is the first joint-stock small hydropower station in Tonglu County, Zhejiang Province and is jointly stocked by 6 units including the Tonglu County Water Conservancy Bureau, the County Power Supply Bureau, and the Provincial Hydropower Development Industry Company. The total investment is 53 million yuan, and 4 sets of 2000kW units are installed. The annual power generation is expected. 25 million kWh in volume. The power station is located in the territory of Indochina and close to the Toka Highway. Construct a 15m long, 235m water dam at Tianmuxi, which borders Lin’an County and Lin’an County. Set up 15 flap gates that automatically adjust the water level. The power station broke ground in November 1994. The construction unit overcame all kinds of difficulties in the construction of regional large-faulted sections and flood disasters, and completed construction one month earlier than originally planned. Its completion has played a positive role in relieving the contradiction between the use of electricity in the mountainous area of Tonglu County and pushing the economy towards a well-off society.