及时复查修改设计阜新电厂除灰线路工程节约钢材30多吨

来源 :水利与电力 | 被引量 : 0次 | 上传用户:dl_wan
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在设计革命运动中,东北电业管理局察觉到阜新发电厂除灰线路工程,存在着不从实际出发的问题,组织了长春、哈尔滨、沈阳、锦州、鞍山等电业局的设计室和吉林、安东电业局的设计组的设计人员,深入现场,共同复查。经复查发现,原设计铁塔结构布置不合理,基础设计得过于保守,计算上也有错误,材料使用上有浪费,而且影响安全。 In the process of designing the revolutionary movement, the Northeast Electric Power Bureau noticed that the Fuxin power plant ash removal line project had the problem of not proceeding from reality, and organized the design offices of electric power bureaus such as Changchun, Harbin, Shenyang, Jinzhou and Anshan and Jilin. The design team of the Anton Electric Power Bureau’s design team went deep into the site and reviewed them together. After review, it was found that the layout of the original design of the iron tower was unreasonable, the design of the foundation was too conservative, there were errors in calculation, there was a waste of material, and the safety was affected.
其他文献
轉知关于建工部制訂的五项大門图集由各設計院,各鉄路局,基建总局直属各工厂: 顷接国家经济委員会(64)經設宋字第1010号給建筑工程部复文的抄件。通知,經审查后同意下列图集
为了編好和审好地质普查勘探的年度設計,更正确地制定出矿区工作計划,去年十二月下旬到今年一月下旬我們选择了两个矿区进行設計現場会审。这两个矿区都是新矿种、新类型,缺
做好基础工作,是加強企业管理的一个重要环节,也是使企业的技术經济工作越做越細的起点和必要的前提条件。只有把这項工作做好,才能为加強企业的科学管理,全面提高管理水平
第一机械工业部标准化工作会议于7月22日至8月1日在沈阳召开。参加这次会议的有各专业局、部分地区的机械工业厅(局)、标准计量局以及工厂和研究机构的同志共200余人。 会议
三月十三日,上海市召开了工业、交通运轮、基本建设、财贸方面社会主义建设先进集体、先进生产(工作)者大会。参加大会的有1960年到1961年当选和1962年当选的先进集体代表和
去年我們編写了一本水庫大型閘門的加工技术条件,当时是坐在設計大楼內查資料、照着“框框”編出来的,結果規定了不少脫离实际的要求。譬如焊縫,大部分要求用γ射綫透視百分
我厂材料資金占用額,在1962年清仓以后一度下降,1963年二季度后又逐漸上升,比清仓当时增加了17.18%。以后时降时升,总是达不到要求。材料占用資金虽然大,在供应方面却还經常
黄河下游修堤工程,是在当地党委统一领导下,结合农村中心工作全面安排的,一般利用农闲季节组织沿河社员参加施工。工程的特点是:任务大、干部少、时间短。根据我们今年到工
水利电力部北京勘测設計院的設計革命运动,从1964年11月10日开始,目前已經形成高潮。許多設計人員做到了充分討論,暢所欲言麄兙驮O計思想和設計方法等方面的問题展开了热
我站于6月7日至11日,在沈阳召开了全省水文系統学习毛主席著作积极分子經驗交流会。参加会議的共39人,其中,学习毛主席著作先进单位代表6人(5个测站,1个机船学习小組),学习