1954年蒙绥合并后,成立了哲盟水利局.我通过干部交流,由原绥远省调来哲盟水利局,迄今正好40年.回顾40年来哲盟水利建设的历程,我觉得大致经历了5个发展阶段:第一阶段:(1957年以前)以防洪治河为主,巩固提高防洪工程,在新开河上扩建白音胡硕滞洪区,新辟他拉干分洪滞洪工程,新开河和西辽河堤防险工经受了1954年较大洪水的考验.继续在沿河平原开展打土井,开河渠,抗旱灌溉的农田水利.但工程简陋,大水漫灌.同时,还进行了修建小型水库,小型水力发电站和锥井下泉,打砖井,木管井的尝试.在南部山丘地区开始了治山保土的初步探索.
After the merger of Menghe in 1954, the Zhemeng Water Conservancy Bureau was established. I communicated with the Zhemeng Water Conservancy Bureau from the former Suiyuan Provincial Government through the exchange of officials. So far it has been 40 years. Looking back on the course of water conservancy construction in Zhelmen for 40 years, I feel that Five stages of development: The first stage (before 1957) was to prevent flood control of rivers, consolidate and improve flood control projects, expand Baiyin Hushuo Flood Retention District on the new river, and open up new flood detention projects in Tarangan, newly opened The river and West Liao River embankments have survived the test of large floods in 1954. They continued to drill and open river channels in the plains along the river to provide irrigation and irrigation for farmland water conservancy. However, the project was primitive and flooded. At the same time, small reservoirs were built. Small hydroelectric power stations and attempts to concrete wells, bricks, and wood tube wells. A preliminary exploration of hilly soil conservation began in the southern hills.