1956年的治黄工作,在社会主义建設的新形势下,有了新的發展。在这一年里,我們以最大努力为三門峽工程輸送了大批技術、行政干部,進行了測繪工作,供給了設計資料,有力地支援了三門峽工程,同时大力進行了配合三門峽工程的支流治理的准备工作。黄河勘測設計院建立后,除在黄河中下游及支援長江進行測量外,还集中力量進行了伊洛河水庫初步設計第一階段的勘探和涇河、無定河、三川河技經报告
In 1956, under the new situation of socialist construction, there has been a new development in the governance of the Yellow Sea. During this year, we made a great effort to send a large number of technical and administrative cadres to the Sanmenxia Project, carried out surveying and mapping work, provided design information, effectively supported the Sanmenxia Project, and vigorously conducted preparations for tributary management in line with the Sanmenxia Project jobs. After the founding of the Yellow River Survey and Design Institute, in addition to measuring the middle and lower reaches of the Yellow River and supporting the Yangtze River, it concentrated its efforts on the exploration of the first phase of the preliminary design of the Yiluo River Reservoir and the report of Jing River, Wuding River and Sanchuan River