论文部分内容阅读
随着古交电厂二期工程及相配套的输煤通道工程建成投产,配煤厂日均生产能力可达18000吨,年均配送电煤600万吨,可将故交矿区五矿(长)煤炭生产加工过程中产生的洗中煤、煤泥、矸石等废物进行混合配比加工后,输送到古交电厂燃用,还可将市场上难以销售的劣质煤进行合理配比,生产出合格的电煤,该项目对我国煤炭行业治理煤矿生产废弃物污染,实现废弃物综合
With the second phase of Gujiao Power Plant and the corresponding coal conveying channel project completed and put into operation, the daily average production capacity of the coal blending plant can reach 18,000 tons, and the annual average coal distribution is 6 million tons, which can be used to mine the Minmetals (long) coal in the mining area. The wastes such as washed coal, coal slime, and vermiculite produced during the production and processing are mixed and processed, and then transported to the Gujiao Power Plant for burning, and the low-quality coal that is difficult to sell on the market can be rationally proportioned to produce qualified products. Electric coal, this project will pollute the coal industry in China to control coal mine production waste and realize waste comprehensive