论文部分内容阅读
梁戈索沃机务段由于生产面积不足,因而ТЭ3型内燃机车的TO—3和TP—1级段修在一条检查地沟上进行。 TO—3级段修作业在五个专用台位上完成。第一台位:对机车进行检修前的准备工作。先对柴油机、辅助电气设备的工作情况以及其他部件和机组的状态进行检查,然后确定检修工作量。同时在这一台位上还进行电气装置、机械和辅助设备的吹扫作业。用机务段自制的专用装置(图1),通过司机室侧窗抽掉内燃机车车体内的灰尘。抽风机为CBM型轴
Owing to the shortage of production area, the beam section of TO-3 and TP-1 of ТЭ3 diesel locomotive was repaired in a ditch of inspection. TO-3 level repair work in five dedicated stations to complete. The first seat: the locomotive for maintenance before the preparatory work. Check the working conditions of the diesel engine, auxiliary electrical equipment and the status of other components and units first, and then determine the inspection workload. At the same time in this position also carried out electrical installations, machinery and auxiliary equipment, cleaning operations. Using the special device made by the locomotive depot (Figure 1), the dust inside the diesel locomotive body is removed through the side window of the driver’s cab. Exhaust fan CBM type shaft