论文部分内容阅读
鸭河口水利枢纽位于河南省,1958年前,我办在这个地区便进行了流域规划和区城规划,全面地综合研究过远景近期相结合的开发条件,并进行了一些勘测、设计工作,为这一枢纽正确的选点选线创造了前提。这个枢纽控制流域面积达2,800平方公里,多年年平均径流量10.2亿立米,总库容11.2亿立米。工程组成包括粘土心墙砂壳土坝、主辅溢洪道、左右岸输水道及坝后式电站。大坝为不清基土坝,坝高32米,坝顶长3,136米,填方约500万立米。其总工程量包括土砂石及
The Duhekou Hydropower Station is located in Henan Province. Before 1958, I conducted a watershed planning and district planning in this area. I comprehensively studied the recent development conditions for long-term prospects and conducted some surveys and designs for The right point of this hub line selection has created the premise. The Hub Control Basin covers an area of 2,800 square kilometers, with an average annual runoff of 1.02 billion cubic meters and a total storage capacity of 1.12 billion cubic meters. The project includes clay core wall sand dams, main and auxiliary spillways, left and right bank waterways and dam-type power plants. The dam is an unclean base earth dam with a dam height of 32 meters and a crest of 3,136 meters and a filling volume of about 5 million cubic meters. The total amount of the project includes earth and gravel