论文部分内容阅读
受控核聚变实验装置“中国环流器一号”(装置代号HL-1,基本建设项目451工程),于1984年9月21日启动,经过一年来的工程联调和最近半年多时间的物理测试,取得了第一批实验结果。实验数据表明,这一装置所产生的“环流等离子体”——带电流的环形等离子体——平衡、稳定、较为洁净,性能符合设计要求。环流等离子体的持续时间(即寿命,或等离子体内环形电流脉冲持续的时间),也就是装置每次放电所产生的等离子体可供细致观测、
The controlled nuclear fusion experimental device “China Circulator No. 1” (installation code HL-1, Capital Construction Project 451 Project) was started on September 21, 1984 and after a year of engineering and physical testing of the last six months or more , Made the first batch of experimental results. Experimental data show that the device produced by the “circulating plasma” - current with a ring plasma - balanced, stable and clean, performance in line with design requirements. The duration of the circulating plasma (ie, lifetime, or the duration of the annular current pulse in the plasma), ie, the plasma generated by each discharge of the device, is available for detailed observation,