日本铁路综合技术研究所已决定对目前的机车车辆试验台进行改造。现在的试验台是于1986年度作为替换当时的老试验台而建立的。但在1987年度根据各铁路运输公司的要求,铁路综合技术研究所决定尽力对目前的试验台进行改造。为了对试验台目前的使用状况及提高试验速度等方面的研究进一步深化,决定强化试验台功能。试验台的改造工作从本年度开始,预计1990年度初完成并交付使用。试验台的主要改造内容如下:
Japan Railway Comprehensive Technology Institute has decided to transform the current rolling stock test bed. The current test bed was set up in 1986 as an old test bed replacement. However, in 1987, according to the requirements of railway transport companies, the Institute of Comprehensive Railway Technology decided to make every effort to renovate the current test bed. In order to test the current use of the test bed and improve the test speed and other aspects of further deepened, decided to strengthen the test bed function. The transformation of the test rig from the beginning of this year is expected to be completed and delivered in early 1990. The main test table changes as follows: