论文部分内容阅读
一、问题的提出目前,铁路工程的施工公路一般都用铁路编制办法编制设计概算。但是,随着改革开放和市场经济的发展、投资体制改革,招、投标及承发包各方对概算工作的要求更加科学、准确和公正,对施工公路有的要求采用公路编制办法。这对铁路设计部门的概算编制者来说尚是一个新课题。为此,笔者就以某铁路专用线的施工公路为例,对采用两种编制办法编制出来的概算结果(见附表)进行对比分析,提出两种编制办法的主要差别,供工程概算编制者参考。
First, the issue raised At present, the construction of railways generally use the preparation of the railway compilation of design estimates. However, with the reform and opening up and the development of the market economy, all parties involved in investment system reform, bidding, bidding and contracting are more scientific, accurate and fair in their demands for budget estimates. Some requirements on the construction of highways adopt the method of highway construction. This is a new topic for the budgeting compiler of the railway design department. Therefore, the author takes the construction highway of a special railway line as an example to compare and analyze the estimated budget results (see the attached table) prepared by using two kinds of compilation methods and put forward the main differences between the two compilation methods for the compilation of the project budget compiler reference.