论文部分内容阅读
龙羊峡水电站位于青海省海南藏族自治州共和县与贵南县交界的龙羊峡谷入口处,上距黄河源头1687公里,下至黄河入海口3776公里,是黄河上中游龙羊峡至青铜峡河段进行梯级开发的第一级电站,被誉为“万里黄河第一坝”。 龙羊峡水电站是我国自行设计、施工的大型水利枢纽工程,以发电为主,兼有防洪、灌溉、防凌、养殖、
Longyangxia Hydropower Station is located at the entrance of Longyang Gorge at the junction of Gonghe County and Guinan County in Hainan Tibetan Autonomous Prefecture of Qinghai Province. It is 1,687 kilometers from the source of the Yellow River and 3,776 kilometers from the Yellow River estuary. It is the Longyangxia to Qingtongxia River on the upper and middle reaches of the Yellow River. The first-stage power station for cascade development is known as the “First Mile of the Yellow River in the Wanli”. Longyangxia Hydropower Station is a large-scale water conservancy project that is designed and constructed in China, mainly for power generation, and has the functions of flood control, irrigation, anti-ling, and breeding.