论文部分内容阅读
本文提出了一种适用于具有多分厂,多机型的纺织企业的生产计划模型。该模型用解除产成品与在各工序所占用设备机台直接联系的方法,解决了各工序不同机型设备之间的互相替代问题,用解除产成品与所需各工序半成品数量之间直接联系的方法,解决了不同来源的半成品之间的互相替代问题。
This paper presents a production planning model that is applicable to textile enterprises with multiple factories and multiple models. This model solves the problem of mutual replacement between different types of equipment in each process by using the method of releasing the finished product and direct contact with the equipment platforms occupied by the various processes. The direct link between the release of finished products and the quantity of semi-finished products required by each process is solved. The method solves the problem of mutual replacement between semi-finished products from different sources.