迎水桥站改扩建是太中银铁路的收尾工程,太中银铁路的开通,使迎水桥站的作业量大幅增加,站场施工改造迫在眉睫。针对迎水桥站原址改扩建施工过渡期长、对运输组织影响大的特点,通过分析车站设备现状和车流情况,结合各车场施工改造方案,提出上行场、调车场、到达场的车流调整方案,以及周边编组站、区段站的辅助疏解措施,以确保施工顺利进行。
The expansion and expansion of Yingshuiqiao station is the finishing line for Taizhongyin Railway. The opening of the Taizhongyin Railway has greatly increased the workload of Yingshuiqiao Station and the construction of the station site is imminent. In view of the long transition period of Ying-Shi Bridge Station’s original site and the great influence on the transport organization, this paper puts forward the traffic flow adjustment plan for the upstream market, yard and arrival by analyzing the status quo of the station equipment and traffic flow, , As well as auxiliary marshalling measures around the marshalling stations and section stations to ensure smooth construction.