竖井开鑿约佔鑛井建设总时间的一半,所以建设鑛井者的首要任务就是提高井筒的掘进速度。1955年斯大林鑛井掘进管理局的掘鑿工和工程技术人员正在继续提高竖井的掘进速度。在库依舍贝夫煤业公司加里宁5/6。号坑口的通风井掘进时,曾于1955年3月份一个月时间内掘进成井202.1公尺。工程师塔列加卡和华西里耶夫,井筒掘进和砌壁工作队队长皮里滨科和库廖绍夫,值班工程师和技术员乌拉辛科夫,卡依沙乌里,穆斯塔
Shaft dredging accounts for about half of the total mine construction time, so the primary task of miners is to raise the speed of wellbore excavation. In 1955, the diggers and engineers of the Stalin Mine Tunnel Authority continued to improve the speed of shaft drilling. In Kalishenbay Coal Company Kalinin 5/6. During the one-month period in March 1955, 202.1 meters of wells were drilled during ventilation of the pithead. Engineers Talegaga and Wassiryev, Captain Pirinenkko and Kulyashaov, team leaders of the wellbore drilling and walling work teams, Urashenko Kharkov, on-duty engineers and technicians,