万家寨水利枢纽大坝工程混凝土总量 150 万 m 3 , 用 4 年时间基本浇完;厂房工程混凝土总量 19 万 m 3 , 浇筑工期两年多, 两项工程混凝土浇筑施工创造了高速度。在浇筑过程中业主和监理都非常重视施工质量, 坚持质量第一, 按照一定的程序和方法进行施工质量控制, 在原材料、浇筑过程和养护消缺等方面, 监理严格检查; 对大坝和厂房的关键部位监理实施重点控制和检查, 取得了预期效果。经过下闸蓄水和首台机发电阶段验收, 工程质量都达到了合格标准。
The total concrete volume of the Wanjiazhai Dam Project is 1.5 million m 3 and is basically finished in 4 years. The total amount of concrete in the workshop is 190,000 m 3, and the construction period is more than two years. The concrete pouring construction of the two projects has created high-speed . During the pouring process, the owners and supervisors attach great importance to the construction quality, insist on quality first, carry out construction quality control in accordance with certain procedures and methods, supervise the strict inspection in the aspects of raw materials, pouring process and maintenance, etc .; The key parts of the supervision of the implementation of key control and inspection, and achieved the desired results. After the next gate impounding and the first Taiwan power generation stage of acceptance, the quality of the project have reached the eligibility criteria.