论文部分内容阅读
本文介绍了流域开发规划和可行性研究阶段的电算模型,借以对各种不同组合梯级电站方案的主要指标和运行特性进行计算和优化,其标准是获得最大的净利益。为节省机时,采用概化的水库“收益”(yield)曲线。可以
This paper introduces the computerized model of river basin development planning and feasibility study stage to calculate and optimize the main indicators and operating characteristics of various combinations of cascaded power station schemes. The standard is to obtain the largest net benefit. To save time, a generalized reservoir “yield” curve is used. can