一、项目概况黄河龙口水利枢纽位于黄河中游托克托至龙口段尾部,水库总库容1.96亿m3,属Ⅱ等大(2)型工程,主要建筑物为2级建筑物,水工建筑物包括拦河坝、河床式电站厂房、泄流底孔、表孔、排沙洞、下游消能设施、副厂房及GIS开关站等组成。河床式电站厂房坝段布置在左岸,表孔坝段布置在右岸。龙口水利枢纽工程于2006
I. Project Overview The Yellow River Longkou Water Control Project is located at the end of the Tuoketuo-Longkou section in the middle reaches of the Yellow River. The total reservoir capacity of the reservoir is 196 million m3, which belongs to the large-scale (2) type Ⅱ project. The main buildings are Grade 2 buildings and hydraulic structures include Barrage, riverbed power plant, drainage bottom hole, hole, sand discharge hole, downstream energy dissipation facilities, deputy plant and GIS switch station and other components. The river bed-type powerhouse dam section is arranged on the left bank and the surface hole dam section is arranged on the right bank. Longkou Water Conservancy Project in 2006