论文部分内容阅读
利用电厂的工业废料制作粉煤灰硅酸盐混凝土墙板(以下简称硅板),建造装配式大板建筑,是变废为宝,综合利用,节约材料和改善环境污染的有效措施,也是发展新型建筑体系,实现建筑工业化的重要途径之一。1975年,陕西省建筑科学研究所和陕西省第二建筑工程公司共同协作,开展了宝鸡电厂
The use of industrial waste from power plants to produce fly ash-silicate concrete wall panels (hereinafter referred to as silicon plates) and the construction of prefabricated large-scale buildings are effective measures for turning waste into treasure, comprehensive utilization, saving materials and improving environmental pollution, and are also developments. The new building system is one of the important ways to realize the industrialization of the building. In 1975, the Shaanxi Institute of Building Research and the Second Construction Engineering Company of Shaanxi Province collaborated to carry out the Baoji Power Plant