This paper considers a hybrid two-stage flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage. T
To deduce error and fussy work of manual adjustment of parameters for an S-surface controller in underwater vehicle motion control, the immune-genetic optimizat
A throttling experiment for the multi-hole orifice (MO) using water was conducted based on the conclusion of key parameters affecting the MO throttling performa
By combining the wavelet decomposition with kernel method, a practical approach of universal multi-scale wavelet kernels constructed in reproducing kernel Hilbe